Shortgate
Build two new patio areas totalling 85 square meters, new alloy French doors,
April 19 May 19

This project started off by removing a 2000mm wide window, cutting out the rest and putting in new alloy French doors then building two steps on to grass area, the client then asked us to remove the grass and prepare and slab the area 35 meters with sandstone which we did.

We re-plastered the inside ready for the client to redecorate, located some pitch pine and repaired the floor, moved electrical sockets etc.

After about two weeks we were asked to remove some 10 year old decking and give our opinion on what would go best for this area 50 square meters, we build new walls, removed old steps and concrete area built new steps and leveled through to the patio area we completed two weeks previously. Built a plinth for new oak water butt. And left clean and tidy.

Pictures before, during & after

Associated with